| High Voltage Shut-off Procedures |
|
|
| 1. | Turn the ignition switch OFF and disconnect the auxiliary (-) battery negative (-) terminal. |
| 2. | Remove the safety plug cover (A).
|
| 3. | Unfasten the hook (A) and then remove the safety plug (C) by pulling the lever (B) to the direction of arrow.
|
| 4. | Wait for more than 5 minutes so that the capacitor in the high voltage system can be fully discharged. |
| 5. | Measure the voltage between the inverter terminals to check that the capacitor in the inverter is discharged completely.
|
Safety PrecautionPrecautions To Take Before Servicing High Voltage System • Since hybrid vehicles contain a high voltage battery, if the high voltage system or vehicles are handled incorrectly, this might lead to a serious accidents like electric shock and electric leakage.
High voltage battery system inspection guide • Be sure to read and follow the "General Safety Information and Caution" before doing any work related with the high voltage system.
InspectionOperating Logic Test (Manual only)Inspect the PTC operation by confirmation logic as follows.1.Entering(1)Set the Floor mode and maximum heating position.(2)Turn off the blower switch.(3)Press the intake (recirculation) button 5 times or more.
Removal1.Disconnect the negative (-) battery terminal.2.Remove the tailgate lid trim.(Refer to Body - "TailGate Lid Trim")3.Disconnect the Rear view camera connector (A).4.Remove the Rear view camera assembly after loosening the mounting screws.Installation1.