| Component Location |

| 1. Engine room junction block |

| 1. Smart junction block (SJB) | 2. ICM relay block |
Component LocationEngine Room Junction BlockE/R Junction BlockCircuit (E/R Junction Block)Metal Core Block (PCB)PCB BlockCircuit (PCB Block)
Inspection1.Turn the ignition switch OFF.2.Disconnect the intake actuator connector.3.Verify that the intake actuator operates to the fresh position when connecting 12V to terminal 3 and grounding terminal 4.Verify that the intake actuator operates to the recirculation position when connected in reverse.
C