| Description |

Fuse Inspection1.Be sure there is no play in the fuse holders, and that the fuses are held securely.2.Are the fuse capacities for each circuit correct?3.
InspectionOut Side Mirror Folding RelayCheck for continuity between the terminals.1.There should be continuity between the No.17 and No.16 terminals when power and ground are connected to the No.
Inspection • Before measuring the pressure of the refriferant line, check whether the refrigerant amount is charged in accordance with the specified charging amount.(Refer to Heating, Ventilation, Air Conditioning - "Specifications")1.
Component Location1. Heater unit assemblyCompoents1. Heater core cover2. Heater core & Seal assembly3. Mode actuator [LH]4. Temperature control actuator [LH]5. Shower duct [LH]6. Duct sensor [Floor]7. PTC Heater8. Duct sensor [Vent]9. Heater & Evaporator lower case10.