| Component location |

| 1. Reservoir 2. Hybrid drive motor 3. Hybrid starter generator (HSG) | 4. Electrical radiator 5. Electric water pump (EWP) |
Removal1.Remove the 12 V battery (-) cable.2.Remove the undercover.(Refer to Engine Mechanical System - "Engine Room Undercover".)3.Drain the coolant from the hybrid cooling system.
InspectionInverter Reservoir Cap Test1.Remove the reservoir cap and mount it on the pressure tester.2.Apply pressure of 93.16 - 122.58 kPa (0.95 - 1.25 kgf/cm², 13.
Component Location1. Blower unit assembly Components1. Duct Seal2. Intake duct case3. Air intake door assembly4. Intake door5. Seal6. Intake duct case (A)7. Air filter cover (A)8. Intake actuator9. Air filter cover10. Air filter 11. Blower unit pad12.
High Voltage Shut-off Procedures • Be sure to read and follow the "General Safety Information and Caution" before doing any work related with the high voltage system. Failure to follow the safety instructions may result in serious electrical injuries.