| Replacement |
| 1. | Turn the ignition switch OFF and disconnect the battery (-) terminal. |
| 2. | Remove the engine room under cover. (Refer to Engine Mechanical System - "Engine Room Under Cover") |
| 3. | Disconnect the reservoir hose (A), and then drain the hydraulic oil from the reservoir (B).
|
| 4. | Connect the reservoir hose (A).
|
| 5. | Refill the specified lubricants in the reservoir and then perform the air bleeding using the GDS.
|
General Information1.Check & Change intervals Check Change Capacity Specified lubricants 15000 km / 1 years(9000 miles / 1years) 40000 km(25000 miles)Remove air from the hydraulic line and theninject hydraulic fluid to the reservoir so that it comes between the MAX and MIN levels of the reservoir.
Replacement1.Remove the battery (-) terminal.2.Remove the engine room under cover.(Refer to Engine Mechanical System - "Engine Room Under Cover")3.Remove the heater hose (A) and AEWP hose (B).4.Disconnect the lock pin to remove the heater hose pump connector (A).
Cruise ControlThe cruise control system is engaged by the cruise "ON/OFF" main switch located on right of steering wheel column. The system has the capability to cruise, coast, accelerate and resume speed.It also has a safety interrupt, engaged upon depressing brake or shifting select lever.