| Inspection |
| 1. | Connect the GDS on the Data Link Connector (DLC). |
| 2. | Turn the ignition switch ON. |
| 3. | Measure the output voltage of the APS 1 and 2 at C.T and W.O.T.
|
Circuit Diagram
InspectionOperating Logic Test (Manual only)Inspect the PTC operation by confirmation logic as follows.1.Entering(1)Set the Floor mode and maximum heating position.(2)Turn off the blower switch.(3)Press the intake (recirculation) button 5 times or more.
Safety PrecautionPrecautions To Take Before Servicing High Voltage System • Since hybrid vehicles contain a high voltage battery, if the high voltage system or vehicles are handled incorrectly, this might lead to a serious accidents like electric shock and electric leakage.