| Inspection |
| 1. | Connect the GDS on the Data Link Connector (DLC). |
| 2. | Turn the ignition switch ON. |
| 3. | Measure the output voltage of the APS 1 and 2 at C.T and W.O.T.
|
Circuit Diagram
Inspection1.Turn the ignition switch OFF. 2.Disconnect the auto defogging connector. 3.Verify that the auto defogging actuator operates to the open position when connecting 12V to terminal 3 and grounding terminal 4. Verify that the auto defogging actuator operates to the close position when connected in reverse.
Safety PrecautionPrecautions To Take Before Servicing High Voltage System • Since hybrid vehicles contain a high voltage battery, if the high voltage system or vehicles are handled incorrectly, this might lead to a serious accidents like electric shock and electric leakage.