| Components |

| 1. EGR cooler pipe C 2. Electric EGR (EEGR) control valve 3. EGR cooler | 4. EGR cooler pipe A 5. Gasket 6. EGR cooler pipe B |
Removal and Installation1.Disconnect the battery negative terminal.2.Remove the air cleaner assembly.(Refer to Intake and Exhaust System - "Air Cleaner")3.
Description and Operation
Inspection • Before measuring the pressure of the refriferant line, check whether the refrigerant amount is charged in accordance with the specified charging amount.(Refer to Heating, Ventilation, Air Conditioning - "Specifications")1.
InspectionOperating Logic Test (Manual only)Inspect the PTC operation by confirmation logic as follows.1.Entering(1)Set the Floor mode and maximum heating position.(2)Turn off the blower switch.(3)Press the intake (recirculation) button 5 times or more.