| Description and Operation |


Components1. EGR cooler pipe C2. Electric EGR (EEGR) control valve3. EGR cooler4. EGR cooler pipe A5. Gasket6. EGR cooler pipe B
Removal and installation1.Disconnect the battery negative terminal.2.Remove the engine room under cover.(Refer to Engine and Transaxle Assembly - "Engine Room Under Cover")3.
Inspection1.Connect the battery voltage and check the blower motor rotation.2.If the blower motor does not operate well, substitute with a known-good blower motor and check for proper operation.3.Replace the blower motor if it is proved that there is a problem with it.
C