| Description and Operation |


Components1. EGR cooler pipe C2. Electric EGR (EEGR) control valve3. EGR cooler4. EGR cooler pipe A5. Gasket6. EGR cooler pipe B
Removal and installation1.Disconnect the battery negative terminal.2.Remove the engine room under cover.(Refer to Engine and Transaxle Assembly - "Engine Room Under Cover")3.
Replacement When prying with a flat-tip screwdriver or use a prying trim tool, wrap it with protective tape, and apply protective tape around the related parts, to prevent damage.1.Disconnect the negative (-) battery terminal.2.Recover the refrigerant with a recovery / recycling / charging station.
C