Removal • Be sure to read and follow the "General Safety Information and Caution" before doing any work related with the high voltage system.
DescriptionThe High Voltage Battery System provides the hybrid drive motor, HSG, and electric A/C compressor with electric energy and also reserves the electric energy generated during regeneration braking.
Inspection1.Connect the battery voltage and check the blower motor rotation.2.If the blower motor does not operate well, substitute with a known-good blower motor and check for proper operation.3.Replace the blower motor if it is proved that there is a problem with it.
Inspection1.Disconnect the negative (-) battery terminal.2.Remove the crash pad lower panel.(Refer to Body - "Crash Pad Lower Panel")3.Remove the lower crash pad switch assembly (A) after disengaging the mounting clip.4.Remove the rheostat switch connector (A).