Integrated Electronic Brake (IEB) System Air Bleeding Procedures • Do not reuse the drained fluid.• Always use genuine DOT3 or DOT4 brake Fluid.
Operation and Leakage CheckCheck all of the following items : Component Procedure Integrated Brake Actuation Unit (IBAU) (A) and Pressure Source Unit (PSU) (B)Check brake operation by applying the brakes during a test drive.
DescriptionThe PTC (Positive Temperature Coefficient) heater is installed at the exit or the backside of the heater core.The PTC heater is an electric heater using a PTC element as an auxiliary heating device that supplements deficiency of interior heat source in highly effective hybrid engine.
DescriptionIn ordinary cars, the mechanical water pump mounted on the engine for heating purposes is activated to circulate the cooling water, but in hybrid cars, AEWP is used to circulate the cooling water when the engine is not operating. Classification System Cooling water used